We were honoured to be recently commissioned by EWT Wind Turbines to showcase the use of one of their turbines at the Ford Engine Plant in Bridgend, South Wales. ¬†This was an incredibly interesting project to work on although the tight timescale meant that we didn’t have much time to enjoy it! We did however get to have a look around the production lines inside the Ford Plant which was a real eye opener.

Using our Cinestar CS8 for aerial imaging combined with our MOVI-5 gimbal and Lumix GH-4 we got some great aerial and handheld shots. Please have a look at the resulting film below.